A two-megawatt wind turbine consists of 260 tons of steel, which requires 300 tons of iron ore and 170 tons of coking coal, all of which must be mined, transported and manufactured using hydrocarbons.
– Each of them consumes 10,000 liters (more than 2,600 gallons) of… pic.twitter.com/CQeiNrfv91
— Camus (@newstart_2024) September 1, 2024